We are renovating for you: Our hotel will be closed from November 9, 2026 until approximately February 2027. Our new treetop spa will reopen in March 2027. Learn more →

Renovation & new spa 2027 · Waldhotel Heppe

Construction diary and outlook

At the very top of the new extension, our wellness and spa area is taking shape: panoramic sauna, herbal sauna, Soledom and spacious relaxation rooms – with a view over the treetops of the Spessart that could hardly be more beautiful from a sauna.

Construction diary

Live from the construction site

Starting November 9, 2026, our extension with a spa above the treetops will be built. We'll keep you updated step by step – with photos directly from the construction site.

16.11.2026

The first week is done.

The first week is over and we are well on schedule.

View entry →

Interessante Baumaterialien

10.11.2026

Support

New supports are being concreted onto the outside of the facade.

View entry →

Hubsteiger im Wald Hotel Heppe zum Dachabbruch

10.11.2026

roof overhang

The roof overhang must be removed everywhere so that the balconies can be attached.

View entry →

Alte Toiletten werden demontiert

10.11.2026

Old toilet demolished

The old toilets were also quickly dismantled and demolished.

View entry →

Küche im Waldhotel Heppe wird demontiert

10.11.2026

The kitchen was quickly dismantled

The kitchen furniture was dismantled within a day; the extractor hood was difficult, but with our partner Gastro Total we managed everything.

View entry →

Baustelle früh am Morgen mit Eisenlieferung

10.11.2026

It begins

On Monday, November 9th, we will start work with several companies at 5 different locations. The shell construction will begin with the concreting of the supports for the next floor, the kitchen will be demolished, the swimming pool ventilation system will be dismantled, the roof overhang will be cut off, and the balconies will be removed.

View entry →

Construction progress

What happens next

Summer 2026

The base slab of the extension has been poured.

From November 9, 2026

The hotel will be closed for approximately three months: Construction on the extension will continue and our kitchen will be renovated.

Expected February 2027

Reopening of restaurant and first rooms – interior work continues.

March 2027

Planned opening of the wellness and spa area.

Visualization of the house with extension and tower – planning status 2025

Watch live

Our construction site camera shows you the current status – regularly updated.

Important for your planning

From November 9, 2026, our hotel will be closed for approximately three months – during this time, we will be renovating both the extension and our kitchen. We anticipate reopening the restaurant and some of our rooms in February 2027, while the interior work in the extension continues. You can see which rooms are available and when directly in our online booking system. If you have any questions, please contact us at +49 6092 941-0.

New from March 2027

Sauna with a view over the forest

Wood, light and panoramic views: Our new spa area is located on the top floor – above the treetops of Germany's largest deciduous forest area.

Large windows open up sweeping views across the green sea of treetops, while the exposed roof beams create a cosy, sheltered feel. And because the new area is connected to our swimming pool by elevator, swimming, sweating and resting become one continuous afternoon.

Discover the new spa →

What to expect

Six places to breathe

Panoramic sauna

The Finnish sauna with gable ceiling and large window front – sweating with a view over the treetops.

Herbal & Organic Sauna

Milder temperatures and the scent of Swiss pine. Ideal for those who prefer a gentler experience.

Soledom with infrared

Warm light from a backlit salt wall, plus four infrared loungers and benches for cozy warming.

Steam room

Moist warmth for skin and respiratory system, designed in a calming natural stone look.

Fresh air terrace

After the sauna, head out into the forest air – onto the roof terrace, at eye level with the treetops.

Relaxation rooms & tea bar

Relaxation pods, double loungers and a quiet relaxation room in the tower with four infrared loungers. Plus fresh tea.

With attention to detail

The little things that make the difference

Ice fountain for cooling

Sensory showers behind illuminated frosted glass

Drinking fountain and tea bar

Lounge with a view over the treetops

Separate areas for nude sauna and swimwear

Elevator directly to the swimming pool

More than a spa

More space for you

Waldhotel Heppe im Spessart bei Sonnenuntergang, umgeben von grünen Wäldern und Wiesen in idyllischer Naturkulisse

New rooms – all the way up to the Sky Suite

The extension will bring spacious single rooms, accessible rooms, tower suites with sweeping views and, at the very top – the only room on the fifth floor – our Sky Suite, above all the others. The tower suites and the Sky Suite will have a shower toilet (washlet). There will also be a new lobby with reception and a playroom for our youngest guests.

Wellness-Pool im Waldhotel Heppe mit Liegestühlen und Winterblick in den verschneiten Spessart

What stays the same

Our swimming pool, measuring 13 x 8 meters and heated to 30°C, remains the centerpiece – and will become part of the new wellness area.

Elevators to all floors

Convenient, step-free access to every floor – from reception to the spa area.

Larger sun terrace

More space for coffee, cake and sunsets over the Spessart region.

Treatment room for massages

A dedicated room for massages and treatments – the perfect complement to the sauna.

Arrival at the cultivation area

New reception area, new lobby

The extension gives our house a new entrance area: a bright reception, a lobby with lounge for arrival and relaxation – and for our little guests the Enchanted Forest, a dedicated playroom.

Visualisierung des neuen Empfangs im Waldhotel Heppe

The new reception

Visualisierung der neuen Lobby im Waldhotel Heppe

The lobby

Visualisierung der neuen Lobby im Waldhotel Heppe, zweite Ansicht

The lobby – second view

Visualisierung der Lounge in der neuen Lobby

The lounge next to the enchanted forest

Visualisierung des Treppenaufgangs in der neuen Lobby

The staircase

Visualisierung des Kinder-Spielzimmers Zauberwald

The Enchanted Forest – our playroom for children

Visualizations – Planning status 2026, subject to change.

Archive · November 2025 to August 2026

Part 1: The Clearing takes shape

The first construction phase brought our new room “The Clearing” with breakfast buffet and counter, an accessible toilet – and, in the summer, the foundation slab for the large extension. This is what it looked like:

Thanks to our partners in the first construction phase

Schwab Brothers

Dürbeck Earthworks

PUK concept

Theo Albert GmbH

BayWa Building Materials

Elektro Beck

Gastro Total

Marco Elter

Bauarbeiten Hotelterrasse Waldhotel Heppe - Renovierung der Außenanlage im Spessart mit neuer Betonierung

23.12.2025

Concrete in masses

Big day: Today the concrete for the foundation slab arrives.

View entry →

Kranwagen bei Bauarbeiten am Waldhotel Heppe im Spessart mit Arbeitern in Sicherheitswesten

24.12.2025

The base plate – just in time for Christmas

The Schwab brothers and their friends gave it their all the day before Christmas Eve – and today I can present the result. A huge thank you to the team for their hard work!

View entry →

Bauarbeiten am Waldhotel Heppe mit Solarpanels und nachhaltiger Erweiterung im Spessart

15.01.2026

The water damage will be repaired.

Work on repairing the water damage begins, first in the guest room, then in the rooms below. In the guest room, the floor has to be removed over a large area; the rooms below will be almost completely gutted.

View entry →

Renovierungsarbeiten im Waldhotel Heppe - Hotelzimmer wird modernisiert für besseren Gästekomfort im Spessart

06.02.2026

It goes on

After a two-week break due to the cold weather, construction work is picking up speed again. The supports that will later hold up the upper floors have been concreted.

View entry →

Renovierung Waldhotel Heppe - Außenfassade mit Baumaterialien während Umbauphase

10.02.2026

High the wall

Slowly but surely the cold disappears, and bricklaying can get underway.

View entry →

Bauarbeiten am Waldhotel Heppe - Mauerarbeiten und Renovierung der Hotelanlage

22.02.2026

Repair of water damage

The repairs to the water damage on the upper floor – our guest room – are progressing.

View entry →

Be among the first

Sign up for our newsletter – we'll be the first to let you know when you can book your stay with the new spa area.

Waldhotel Heppe · Surrounded by nature

Heppe 1 · 63874 Dammbach
06092 941-0 · info@waldhotelheppe.de

Book now